Wayam AI
Retail and CPGProcurementClient project

Dynamic Safety Stock and Reorder Point Optimization in Retail Distribution

A national retail chain operating 12 regional distribution centers (DCs) supplying 400 retail store locations with 30,000 SKUs.

Run on Purti · Supply Chain

Storage bays holding to a threshold line, one dipping below
$18Mworking capital released from safety stock
45%retail store stockout incidents reduced
The problem2 min read

Planners used static safety stock rules (e.g., maintain 14 days of supply for all SKUs), resulting in $25M in working capital tied up in slow-moving inventory.

What we did, with Purti

Demand and Lead-Time Analytics → Daily Reorder Point Calculation → Inter-DC Inventory Balancing → Working Capital Optimization

The result

$18M in working capital released by reducing unnecessary safety stock on stable SKUs.

The challenge

01

Planners used static safety stock rules (e.g., maintain 14 days of supply for all SKUs), resulting in $25M in working capital tied up in slow-moving inventory.

02

Simultaneously, high-demand promotional SKUs suffered frequent stockouts due to unpredicted regional demand surges and transit delays.

03

Manual reorder point adjustments across 30,000 SKUs overwhelmed planning teams.

How our team solved it, with Purti

  1. 01

    Demand and Lead-Time Analytics

    Purti continuously analyzes local sales velocity, weather patterns, promotional calendars, and carrier lead-time variability.

  2. 02

    Daily Reorder Point Calculation

    Purti recalculates safety stock per SKU per distribution center every 24 hours.

  3. 03

    Inter-DC Inventory Balancing

    Excess stock of fast-moving SKUs in DC East is identified, and transfer orders to DC West are proposed before stockouts occur.

  4. 04

    Working Capital Optimization

    Safety stock is reduced for low-variability, short lead-time SKUs without raising stockout risk.

  5. 05

    Planner-Approved ERP Orders

    Inventory planners review the reorder and transfer proposals, and approved orders flow into SAP and Oracle ERP systems.

The outcome

Before
  • Planners used static safety stock rules (e.g., maintain 14 days of supply for all SKUs), resulting in $25M in working capital tied up in slow-moving inventory.
  • Simultaneously, high-demand promotional SKUs suffered frequent stockouts due to unpredicted regional demand surges and transit delays.
  • Manual reorder point adjustments across 30,000 SKUs overwhelmed planning teams.
After, with Purti
  • $18M in working capital released by reducing unnecessary safety stock on stable SKUs.
  • Retail store stockout incidents reduced by 45% on high-demand promotional items.
  • Automated reorder point management across 30,000 SKUs, cutting manual planner workload by 80%.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

forecastingsystem connectorsscenario simulationalert routingrisk scoring

Run on Purti

Watch Purti run, end to end, in a few minutes.

Supply Chain

Supply-chain disruption prediction.

See the Purti accelerator

More from Purti

Bring us the version of this that you actually have.

Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.