Global Freight Disruption and Intermodal Logistics Rerouting
A global power equipment manufacturer shipping heavy transformers and turbine housings via international maritime, rail, and heavy haul trucking routes.
Run on Sankalp · Disruption Replanning

A critical international port strike and canal transit restrictions stranded 40 ocean freight containers of key sub components.
Live Intermodal Tracking and Alerting → Disruption Ripple Modeling → Intermodal Rerouting Optimization → Assembly Line Resequencing
Zero assembly line shutdowns despite a 14 day major international port disruption.
The challenge
A critical international port strike and canal transit restrictions stranded 40 ocean freight containers of key sub components.
Downstream final assembly lines faced complete shutdown within 72 hours if alternative transport corridors were not established.
Logistics coordinators lacked real time visibility into alternative intermodal freight routes and associated shipping cost trade offs.
How our team solved it, with Sankalp
- 01
Live Intermodal Tracking and Alerting
Sankalp integrates maritime AIS vessel tracking and port congestion indices directly with active manufacturing work orders.
- 02
Disruption Ripple Modeling
Sankalp calculates the shop floor assembly impact and part shortage timelines caused by in transit freight delays.
- 03
Intermodal Rerouting Optimization
Sankalp models air cargo, secondary port, and rail routes, balancing expedited freight costs against factory downtime penalties.
- 04
Assembly Line Resequencing
Factory assembly schedules are resequenced to prioritize orders with local material availability while expedited components transit.
- 05
Logistics Director Approval
The logistics director approves the chosen rerouting plan, and Sankalp sends the booking instructions to logistics partners.
The outcome
- A critical international port strike and canal transit restrictions stranded 40 ocean freight containers of key sub components.
- Downstream final assembly lines faced complete shutdown within 72 hours if alternative transport corridors were not established.
- Logistics coordinators lacked real time visibility into alternative intermodal freight routes and associated shipping cost trade offs.
- Zero assembly line shutdowns despite a 14 day major international port disruption.
- 92% of critical customer delivery commitments maintained through optimized intermodal rerouting.
- Avoided $1.2M in contractual liquidated damages and factory idle labor costs.
Delivered for a client; the client name is withheld under NDA. References are available on request.
Capabilities used
Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.
Run on Sankalp
Watch Sankalp run, end to end, in a few minutes.

When freight, tariffs, or material prices move, arrive with options, not alerts.
See the Sankalp acceleratorMore from Sankalp

Raw Material Price Shock Absorption and Margin Preserving Replanning
A major structural steel and heavy pressure vessel manufacturer consuming 45,000 metric tons of specialized alloy plate and forged fittings annually.
Read the use case
Geopolitical Trade Tariff and Supply Chain Embargo Mitigation
An international defense and aerospace subsystem manufacturer sourcing precision machined forgings and optical components across multiple global jurisdictions.
Read the use case
Catastrophic Factory Disruption and Multi Site Work Order Resequencing
A major industrial valve and actuator manufacturer with 5 plants, experiencing a major structural fire at Plant 2 that disabled the main heat treatment and machining bay for 60 days.
Read the use caseBring us the version of this that you actually have.
Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.