Harmonizing EBOM to MBOM Discrepancies During Electric Vehicle Ramp

An Electric Vehicle (EV) original equipment manufacturer ramping up a new dual motor SUV platform across two high volume vehicle assembly plants.

Run on Sama · BOM Synchronization

Two parallel columns of parts being pulled into register
4 hoursfor ECO reconciliation and MBOM update
94%fewer BOM-related line stoppages
$1.4Mlower scrap and obsolete write-offs
The problem2 min read

Frequent Engineering BOM (EBOM) updates released by R&D; (such as battery busbar revisions and harness routing updates) were out of sync with plant Manufacturing BOMs (MBOMs).

What we did, with Sama

Unified BOM Dashboard → Discrepancy Detection → Part Dependency Trees → ECO Impact Analysis

The result

ECO reconciliation and MBOM update cycle time cut from 3 weeks to under 4 hours.

The challenge

01

Frequent Engineering BOM (EBOM) updates released by R&D; (such as battery busbar revisions and harness routing updates) were out of sync with plant Manufacturing BOMs (MBOMs).

02

Plant manufacturing engineers relied on weekly spreadsheet reconciliations, leading to assembly line part shortages and line stoppage.

03

Engineering Change Orders (ECOs) took up to 3 weeks to manually reconcile across plant MBOMs, resulting in $1.8M in obsolete component write offs.

How our team solved it, with Sama

  1. 01

    Unified BOM Dashboard

    Sama brings CAD-derived EBOMs and plant-specific MBOMs into a single real time synchronization view.

  2. 02

    Discrepancy Detection

    Sama highlights part number mismatches, quantity deltas, and revision discrepancies between engineering and manufacturing.

  3. 03

    Part Dependency Trees

    Interactive dependency trees show how changes to battery modules ripple into structural brackets and wiring harnesses.

  4. 04

    ECO Impact Analysis

    Line item revision deltas are computed, and manufacturing engineers are alerted to pending engineering change releases.

  5. 05

    Engineer-Approved MBOM Dispatch

    The plant manufacturing engineer approves each change, and Sama pushes it to plant ERP and MES systems without manual re-entry.

The outcome

Before
  • Frequent Engineering BOM (EBOM) updates released by R&D; (such as battery busbar revisions and harness routing updates) were out of sync with plant Manufacturing BOMs (MBOMs).
  • Plant manufacturing engineers relied on weekly spreadsheet reconciliations, leading to assembly line part shortages and line stoppage.
  • Engineering Change Orders (ECOs) took up to 3 weeks to manually reconcile across plant MBOMs, resulting in $1.8M in obsolete component write offs.
After, with Sama
  • ECO reconciliation and MBOM update cycle time cut from 3 weeks to under 4 hours.
  • BOM mismatch related assembly line stoppages reduced by 94% during platform launch.
  • Scrap and obsolete component inventory write offs reduced by $1.4M.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

system connectorsanomaly detectionroot cause reasoningworkflow orchestrationevidence audit trail

Run on Sama

Watch Sama run, end to end, in a few minutes.

BOM Synchronization

Engineering, manufacturing, service, and software BOMs kept in step as designs move.

See the Sama accelerator