Wayam AI
Energy and utilitiesMaintenance & ReliabilityClient project

Battery Energy Storage System (BESS) Degradation and Arbitrage Optimization

A clean energy asset manager operating a 100MW / 400MWh grid-scale lithium-ion Battery Energy Storage System (BESS) co-located with a solar PV farm.

Run on Santulan · Energy Optimization

A storage cell filling and emptying against a wearing capacity ceiling
22%increase in net annual BESS operating margin
94%eliminated solar PV curtailment losses
The problem2 min read

BESS asset managers struggled to balance daily energy market revenue arbitrage (charging low, discharging high) against battery chemical degradation costs.

What we did, with Santulan

Battery Health Modeling → Degradation-Aware Bidding → Market Arbitrage Engine → Co-located Solar Charging

The result

22% increase in net annual BESS operating margin through degradation-optimized market bidding.

The challenge

01

BESS asset managers struggled to balance daily energy market revenue arbitrage (charging low, discharging high) against battery chemical degradation costs.

02

Aggressive daily cycling at high ambient temperatures caused accelerated lithium plating, reducing battery capacity prematurely.

03

Manual bidding strategies failed to capture fast frequency response price spikes in wholesale electricity markets.

How our team solved it, with Santulan

  1. 01

    Battery Health Modeling

    Santulan tracks cell-level temperature, state of health, depth of discharge, and C-rate stress in real time.

  2. 02

    Degradation-Aware Bidding

    Santulan calculates the battery degradation cost per MWh of throughput for every proposed charge and discharge cycle.

  3. 03

    Market Arbitrage Engine

    Day-ahead and real-time wholesale price feeds drive dispatch schedules that capture peak price spreads.

  4. 04

    Co-located Solar Charging

    Solar PV generation curves are matched to BESS charging schedules to cut grid curtailment losses.

  5. 05

    Frequency Regulation Dispatch

    Sub-second ancillary service bids are executed when market prices justify high-frequency battery cycling.

  6. 06

    Trader Approval

    The asset manager's energy trader reviews and approves the daily bidding strategy and degradation limits before Santulan submits bids.

The outcome

Before
  • BESS asset managers struggled to balance daily energy market revenue arbitrage (charging low, discharging high) against battery chemical degradation costs.
  • Aggressive daily cycling at high ambient temperatures caused accelerated lithium plating, reducing battery capacity prematurely.
  • Manual bidding strategies failed to capture fast frequency response price spikes in wholesale electricity markets.
After, with Santulan
  • 22% increase in net annual BESS operating margin through degradation-optimized market bidding.
  • Extended battery asset operational lifespan by 3 years, delaying multi-million-dollar cell replacement cycles.
  • Eliminated solar PV curtailment losses by 94% using co-located smart charging control.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

signal ingestionforecastinganomaly detectionscenario simulationalert routing

Run on Santulan

Watch Santulan run, end to end, in a few minutes.

Energy Optimization

Renewable-energy asset optimization and monitoring.

See the Santulan accelerator

More from Santulan

Bring us the version of this that you actually have.

Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.