Wayam AI
Energy and utilitiesOperationsClient project

Dynamic Wind Turbine Yaw and Pitch Optimization for Annual Energy Production

An IPP renewable energy operator managing a 450MW offshore wind farm featuring 60 high-capacity wind turbines operating under complex turbulent wind wake conditions.

Run on Santulan · Energy Optimization

An array of vanes turning together to find the same angle
3.4%more net annual energy production
$1.8Madded annual electricity revenue
15%less gearbox and blade fatigue
The problem2 min read

Upwind turbines created turbulent wake vortices that reduced wind speed and energy yield for downstream turbines by up to 12%.

What we did, with Santulan

Wake and Wind Analytics → Cooperative Farm Controller → Energy Yield Maximization → Fatigue Stress Mitigation

The result

3.4% increase in net Annual Energy Production (AEP), generating $1.8M in additional annual electricity revenue.

The challenge

01

Upwind turbines created turbulent wake vortices that reduced wind speed and energy yield for downstream turbines by up to 12%.

02

Static factory yaw and pitch control curves failed to adapt to real-time micro-turbulent wind direction shifts.

03

Aerodynamic fatigue stress on turbine blades accelerated mechanical gearbox wear, driving up offshore maintenance costs.

How our team solved it, with Santulan

  1. 01

    Wake and Wind Analytics

    Santulan models farm-wide wake interactions using real-time SCADA and LiDAR wind vector telemetry.

  2. 02

    Cooperative Farm Controller

    Santulan calculates cooperative yaw offset and blade pitch commands across all 60 turbines at once.

  3. 03

    Energy Yield Maximization

    Upstream wakes are steered away from downstream turbines to raise farm-level annual energy production (AEP).

  4. 04

    Fatigue Stress Mitigation

    Blade load sensors are monitored and pitch is adjusted to cap peak mechanical stress during storm gusts.

  5. 05

    Offshore SCADA Integration

    Santulan connects to Siemens Gamesa and Vestas SCADA control loops over secure industrial protocols.

  6. 06

    Control Room Approval

    The wind farm control room lead reviews and approves each new set of yaw and pitch strategies before they go live on the turbines.

The outcome

Before
  • Upwind turbines created turbulent wake vortices that reduced wind speed and energy yield for downstream turbines by up to 12%.
  • Static factory yaw and pitch control curves failed to adapt to real-time micro-turbulent wind direction shifts.
  • Aerodynamic fatigue stress on turbine blades accelerated mechanical gearbox wear, driving up offshore maintenance costs.
After, with Santulan
  • 3.4% increase in net Annual Energy Production (AEP), generating $1.8M in additional annual electricity revenue.
  • 15% reduction in mechanical gearbox and blade fatigue stress, extending offshore maintenance intervals.
  • Zero downtime recorded during extreme wind direction shifts.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

signal ingestionforecastinganomaly detectionscenario simulationalert routing

Run on Santulan

Watch Santulan run, end to end, in a few minutes.

Energy Optimization

Renewable-energy asset optimization and monitoring.

See the Santulan accelerator

More from Santulan

Bring us the version of this that you actually have.

Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.