Closed Loop Product Lifecycle Sama and Digital Twin Alignment
An aerospace and defense contractor manufacturing satellite systems, avionics enclosures, and unmanned aerial vehicles.
Run on Sama · BOM Synchronization

BOM data was fragmented across disconnected PLM, ERP, MES, and MRO software systems throughout the 20 year product lifecycle.
Lifecycle Digital Thread → Serialized Component Traceability → Lifecycle Baseline Comparison → Field Failure Feedback
Traceability audit preparation time cut from 3 weeks to under 60 seconds.
The challenge
BOM data was fragmented across disconnected PLM, ERP, MES, and MRO software systems throughout the 20 year product lifecycle.
As designed, as planned, as built, and as maintained BOM baselines diverged over time, making traceability audits slow and risky.
Defense audit compliance required 100% serialized component traceability, which took weeks of manual records retrieval for each aircraft.
How our team solved it, with Sama
- 01
Lifecycle Digital Thread
Sama connects the as-designed EBOM, as-planned MBOM, as-built MES record, and as-maintained SBOM into one digital thread.
- 02
Serialized Component Traceability
Component lot numbers, serial numbers, and calibration certificates are recorded for every manufactured unit.
- 03
Lifecycle Baseline Comparison
Sama highlights deltas between the original design specification and current field configurations.
- 04
Field Failure Feedback
Field maintenance failure data feeds back into R&D engineering BOMs to inform future design revisions.
- 05
Audit Dossier Approval
The quality assurance manager reviews and certifies each AS9100 audit dossier before it is released to the defense customer.
The outcome
- BOM data was fragmented across disconnected PLM, ERP, MES, and MRO software systems throughout the 20 year product lifecycle.
- As designed, as planned, as built, and as maintained BOM baselines diverged over time, making traceability audits slow and risky.
- Defense audit compliance required 100% serialized component traceability, which took weeks of manual records retrieval for each aircraft.
- Traceability audit preparation time cut from 3 weeks to under 60 seconds.
- 100% data integrity maintained across 20 year product lifecycle digital threads.
- Accelerated engineering design improvement cycles by 35% through closed loop field reliability feedback.
Delivered for a client; the client name is withheld under NDA. References are available on request.
Capabilities used
Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.
Run on Sama
Watch Sama run, end to end, in a few minutes.

Engineering, manufacturing, service, and software BOMs kept in step as designs move.
See the Sama acceleratorMore from Sama

Harmonizing EBOM to MBOM Discrepancies During Electric Vehicle Ramp
An Electric Vehicle (EV) original equipment manufacturer ramping up a new dual motor SUV platform across two high volume vehicle assembly plants.
Read the use case
Aligning Hardware EBOM and Embedded Firmware Software BOM
A smart automotive Tier 1 supplier producing Advanced Driver Assistance System (ADAS) domain controllers integrating radar sensors, cameras, and microcontrollers.
Read the use case
Field Service BOM Alignment for Warranty and Aftermarket Operations
A commercial bus and truck manufacturer with a global dealer network managing 150,000 active fleet vehicles across 25 international markets.
Read the use caseBring us the version of this that you actually have.
Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.