The problem2 min read

Configuring custom vehicle builds required manual interpretation of complex 150 page option compatibility matrices and 150% BOMs.

What we did, with Sama

150% Configurable BOM → Single Vehicle BOM Resolution → Option Conflict Flagging → Cost and Weight Rollup

The result

Custom vehicle order BOM validation time reduced from 4 days to 3 seconds.

The challenge

01

Configuring custom vehicle builds required manual interpretation of complex 150 page option compatibility matrices and 150% BOMs.

02

Sales orders with invalid option combinations slipped through to the shop floor, resulting in missing wiring harnesses and stopped assembly lines.

03

Engineers spent 40% of their time manually reviewing custom customer orders to resolve option rule conflicts.

How our team solved it, with Sama

  1. 01

    150% Configurable BOM

    Sama manages 150% master BOM structures with embedded Boolean logic and option code dependency rules.

  2. 02

    Single Vehicle BOM Resolution

    Sama resolves sales option selections into a complete 100% build BOM for each custom vehicle order.

  3. 03

    Option Conflict Flagging

    Mutually exclusive options and missing prerequisite components are flagged at order entry.

  4. 04

    Cost and Weight Rollup

    Vehicle weight, center of gravity, and component cost are calculated from the selected option packages.

  5. 05

    Engineer-Approved Travelers

    An order engineer reviews any flagged conflicts and approves the build, and station-by-station assembly travelers and kitting lists go to the factory floor.

The outcome

Before
  • Configuring custom vehicle builds required manual interpretation of complex 150 page option compatibility matrices and 150% BOMs.
  • Sales orders with invalid option combinations slipped through to the shop floor, resulting in missing wiring harnesses and stopped assembly lines.
  • Engineers spent 40% of their time manually reviewing custom customer orders to resolve option rule conflicts.
After, with Sama
  • Custom vehicle order BOM validation time reduced from 4 days to 3 seconds.
  • 100% elimination of invalid option combinations and missing harness errors on the assembly line.
  • Reduced custom vehicle engineering order processing costs by 65%.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

system connectorsanomaly detectionroot cause reasoningworkflow orchestrationevidence audit trail

Run on Sama

Watch Sama run, end to end, in a few minutes.

BOM Synchronization

Engineering, manufacturing, service, and software BOMs kept in step as designs move.

See the Sama accelerator

More from Sama

Bring us the version of this that you actually have.