ManufacturingOperationsClient project

Global 60+ Plant Capacity Balancing and Workload Re-Allocation

A multinational industrial equipment manufacturer operating 60+ production facilities across 4 continents, producing custom hydraulic pumps, valves, and heavy gearboxes.

Run on Niyojan · Production Planning

Load levelling across a wide grid of plant cells
18%higher fleet capacity utilization
75%lower unplanned overtime costs
2 hoursglobal master planning cycle
The problem2 min read

Primary manufacturing facilities in North America operated at 95% capacity overload while secondary plants in South America sat underutilized at 60% capacity.

What we did, with Niyojan

Enterprise Plant Command Cockpit → Multi-Plant Order Allocation → Dynamic Capacity Balancing → Global Constraint Identification

The result

18% overall increase in enterprise fleet capacity utilization across 60+ manufacturing plants.

The challenge

01

Primary manufacturing facilities in North America operated at 95% capacity overload while secondary plants in South America sat underutilized at 60% capacity.

02

Planners managed facility schedules in isolated spreadsheet silos, making cross-factory workload re-allocation slow and complex.

03

Overloaded plants incurred massive unplanned overtime costs while underutilized plants suffered idle labor overhead.

How our team solved it, with Niyojan

  1. 01

    Enterprise Plant Command Cockpit

    Niyojan unifies active order books, machine utilization rates, labor availability, and shipping logistics across all 60+ facilities into one live dashboard.

  2. 02

    Multi-Plant Order Allocation

    Niyojan weighs global machine capabilities, tooling availability, customer delivery windows, and freight costs to calculate optimal order placement.

  3. 03

    Dynamic Capacity Balancing

    Niyojan proposes moving standard product runs from overloaded North American plants to open capacity bays in South America.

  4. 04

    Global Constraint Identification

    Niyojan flags multi-plant bottlenecks, such as global shortages of heat-treatment furnace hours, before schedule commitments are released.

  5. 05

    Planning Lead Approval

    The global planning lead reviews the proposed allocations and approves the master schedule before Niyojan publishes it to local plant ERP systems.

The outcome

Before
  • Primary manufacturing facilities in North America operated at 95% capacity overload while secondary plants in South America sat underutilized at 60% capacity.
  • Planners managed facility schedules in isolated spreadsheet silos, making cross-factory workload re-allocation slow and complex.
  • Overloaded plants incurred massive unplanned overtime costs while underutilized plants suffered idle labor overhead.
After, with Niyojan
  • 18% overall increase in enterprise fleet capacity utilization across 60+ manufacturing plants.
  • 75% reduction in unplanned overtime costs by balancing workload evenly across global facilities.
  • Accelerated global master planning cycle time from 10 days to 2 hours.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

constraint solvingsystem connectorsforecastingscenario simulationworkflow orchestration

Run on Niyojan

Watch Niyojan run, end to end, in a few minutes.

Production Planning

Multi-plant production planning at enterprise scale.

See the Niyojan accelerator