Order SLA Protection and Overtime Minimization During Demand Spikes

A commercial HVAC equipment manufacturer producing custom rooftop air handling units with high seasonal demand surges during pre-summer months.

Run on Niyojan · Production Planning

A surge absorbed without the commitment line being crossed
100%on-time delivery through demand spike
62%lower overtime labor spend
45%volume surge absorbed
The problem2 min read

A 45% seasonal surge in customer orders threatened contract delivery SLAs, risking heavy liquidated damage penalties.

What we did, with Niyojan

Demand Surge Schedule Simulation → Targeted Bottleneck Overtime → Non-Bottleneck Shift Smoothing → Customer Priority Rules

The result

100% on-time delivery maintained across pre-summer demand spike season with zero SLA penalty fines.

The challenge

01

A 45% seasonal surge in customer orders threatened contract delivery SLAs, risking heavy liquidated damage penalties.

02

Plant managers authorized uncoordinated weekend overtime across all departments, driving labor costs up by 35% without resolving specific assembly bottlenecks.

03

Planners could not determine which specific departments actually required overtime to protect delivery SLAs.

How our team solved it, with Niyojan

  1. 01

    Demand Surge Schedule Simulation

    Niyojan models incoming order volumes against finite plant capacity, identifying exact delivery SLA breach risks.

  2. 02

    Targeted Bottleneck Overtime

    Niyojan calculates the minimum overtime hours needed at bottleneck work centers such as coil brazing to preserve 100% of order SLAs.

  3. 03

    Non-Bottleneck Shift Smoothing

    Non-bottleneck departments such as sheet metal fabrication stay on standard shifts, removing unnecessary overtime spend.

  4. 04

    Customer Priority Rules

    Niyojan sequences orders by contract penalty severity and customer SLA windows.

  5. 05

    Plant Director Approval

    Plant directors compare the cost and SLA trade-offs of each overtime proposal and approve the overtime plan.

The outcome

Before
  • A 45% seasonal surge in customer orders threatened contract delivery SLAs, risking heavy liquidated damage penalties.
  • Plant managers authorized uncoordinated weekend overtime across all departments, driving labor costs up by 35% without resolving specific assembly bottlenecks.
  • Planners could not determine which specific departments actually required overtime to protect delivery SLAs.
After, with Niyojan
  • 100% on-time delivery maintained across pre-summer demand spike season with zero SLA penalty fines.
  • 62% reduction in overtime labor spend by restricting overtime exclusively to identified bottleneck workstations.
  • Preserved project gross margins while absorbing a 45% volume surge.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

constraint solvingsystem connectorsforecastingscenario simulationworkflow orchestration

Run on Niyojan

Watch Niyojan run, end to end, in a few minutes.

Production Planning

Multi-plant production planning at enterprise scale.

See the Niyojan accelerator

More from Niyojan

Bring us the version of this that you actually have.

Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.