A manufacturer of industrial Variable Frequency Drives (VFDs) and power control modules produces high-voltage power conversion units for water treatment facilities and automated factory floors. Each drive undergoes rigorous end-of-line electrical testing before field installation.

Run on Anvaya · Production Execution & Traceability

Threads running both upstream and downstream from a single flagged node
20 minutesfrom field failure to root cause
48defective units intercepted before shipping
100%of rework costs recovered
The problem2 min read

A field failure is reported for an installed VFD (Serial # VFD-9021-X) that suffered a thermal power stage breakdown after 100 hours of operation.

What we did, with Anvaya

Backward Serial Traceability → Vendor Defect Correlation → Forward Trace to Active WIP → Inline WIP Identification

The result

Investigation time from field failure report to root-cause isolation drops from 5 days to 20 minutes.

The challenge

01

A field failure is reported for an installed VFD (Serial # VFD-9021-X) that suffered a thermal power stage breakdown after 100 hours of operation.

02

Quality engineers must quickly determine whether the failure was caused by shop-floor assembly error, incorrect test parameters, or a defective vendor component lot.

03

Legacy traceability is strictly unidirectional; finding whether other active WIP jobs contain components from the same suspect batch requires opening hundreds of physical job jackets.

How our team solved it, with Anvaya

  1. 01

    Backward Serial Traceability

    Quality engineers enter Serial # VFD-9021-X into Anvaya Bidirectional Traceability, which traces back to the power MOSFET lot used in assembly, Lot # MOSFET-441-A.

  2. 02

    Vendor Defect Correlation

    Component test data confirms that Lot # MOSFET-441-A has a latent silicon gate defect from the semiconductor vendor.

  3. 03

    Forward Trace to Active WIP

    Engineers switch to forward tracing from Lot # MOSFET-441-A, and Anvaya searches all active shop-floor work orders.

  4. 04

    Inline WIP Identification

    Anvaya flags three active production orders on the assembly line that contain MOSFETs from the defective batch.

  5. 05

    Supervisor Containment Decision

    Quality supervisors approve a hold on the affected orders and send rework instructions to operator workstations before final potting and box-build.

The outcome

Before
  • A field failure is reported for an installed VFD (Serial # VFD-9021-X) that suffered a thermal power stage breakdown after 100 hours of operation.
  • Quality engineers must quickly determine whether the failure was caused by shop-floor assembly error, incorrect test parameters, or a defective vendor component lot.
  • Legacy traceability is strictly unidirectional; finding whether other active WIP jobs contain components from the same suspect batch requires opening hundreds of physical job jackets.
After, with Anvaya
  • Investigation time from field failure report to root-cause isolation drops from 5 days to 20 minutes.
  • 48 defective VFD units currently in production are intercepted and reworked before shipping to customer sites.
  • The manufacturer submits an indisputable, data-backed warranty claim to the semiconductor vendor, recovering 100% of material rework costs.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

system connectorssignal ingestionroot cause reasoninganomaly detectionworkflow orchestrationevidence audit trail

Run on Anvaya

Watch Anvaya run, end to end, in a few minutes.

Production Execution & Traceability

Every order traced from raw material to finished unit, in one genealogy view.