A high-mix, medium-volume industrial equipment manufacturer produces heavy hydraulic manifolds and valve block assemblies for mining and earthmoving machinery. Their plant operates across six discrete production stages: CNC machining, deburring, ultrasonic cleaning, valve spool fitting, high-pressure hydraulic testing, and final painting. The plant handles dozens of concurrent customer orders with strict delivery windows and contract penalties for late delivery.

Run on Anvaya · Production Execution & Traceability

A queue of work backing up behind one narrow point in the line
85%lower expediting and overtime costs
14customer orders kept on schedule
0late-delivery penalty charges
The problem2 min read

A sudden influx of custom valve spool orders causes a severe, silent backlog at the spool fitting workstation.

What we did, with Anvaya

Live Queue Monitoring → Bottleneck Detection → Affected Order Isolation → Planner-Led Replanning

The result

Testing and assembly lines operate without interruption, preventing schedule slippage across 14 high-value customer orders.

The challenge

01

A sudden influx of custom valve spool orders causes a severe, silent backlog at the spool fitting workstation.

02

Planners rely on end-of-shift paper traveler sheets and once-daily ERP batch updates, catching bottlenecks only after downstream assembly lines run out of parts.

03

Floor expediters scramble via phone calls and whiteboards to authorize costly overtime without clear visibility into machine capacity or true order priority.

How our team solved it, with Anvaya

  1. 01

    Live Queue Monitoring

    Anvaya shows job movement across all workstations on the live Production Timeline and tracks cycle times and queue volumes.

  2. 02

    Bottleneck Detection

    Anvaya flags the valve spool fitting workstation as a severe constraint before downstream assembly cells run out of WIP.

  3. 03

    Affected Order Isolation

    Planners use Order Tracking to filter the 14 active production orders queued at or routing through the spool fitting station.

  4. 04

    Planner-Led Replanning

    Planners review live utilization across alternative work centers in Anvaya and approve a new sequence that moves standard spool fitting to secondary stations and keeps the primary station for custom jobs.

  5. 05

    Schedule Dispatch

    The approved schedule goes straight to shop-floor operator terminals, replacing paper travelers and phone calls.

The outcome

Before
  • A sudden influx of custom valve spool orders causes a severe, silent backlog at the spool fitting workstation.
  • Planners rely on end-of-shift paper traveler sheets and once-daily ERP batch updates, catching bottlenecks only after downstream assembly lines run out of parts.
  • Floor expediters scramble via phone calls and whiteboards to authorize costly overtime without clear visibility into machine capacity or true order priority.
After, with Anvaya
  • Testing and assembly lines operate without interruption, preventing schedule slippage across 14 high-value customer orders.
  • Floor expediting and unplanned overtime costs drop by ~85% through automated queue monitoring and proactive capacity balancing.
  • Zero SLA late-delivery penalty charges are incurred during peak production volume.

Delivered for a client; the client name is withheld under NDA. References are available on request.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

system connectorssignal ingestionroot cause reasoninganomaly detectionworkflow orchestrationevidence audit trail

Run on Anvaya

Watch Anvaya run, end to end, in a few minutes.

Production Execution & Traceability

Every order traced from raw material to finished unit, in one genealogy view.

See the Anvaya accelerator

More from Anvaya

Bring us the version of this that you actually have.

Every engagement is fixed in scope and milestone-gated. The scoping conversation starts with your systems, not with a template.