Niyojan
Multi-plant production planning at enterprise scale.

Overview
Niyojan plans production across dozens of plants at once, balancing demand, capacity, and constraints that no hand-built schedule can hold together. It optimizes across 60+ facilities, honors real limits like materials and capacity, and replans as conditions change – recovering the capacity and margin that manual planning leaves behind.
The problem
Planning production across dozens of plants by hand leaves capacity and margin on the table.
The outcome
Optimized scheduling across 60+ facilities, balancing demand, capacity, and constraints.
Modules

Multi-Plant Optimization
Schedule across 60+ facilities together.

Constraint Solving
Honor capacity, materials, and demand.

Replanning
Adapt schedules as conditions change.
How it works
Model the network
Demand, capacity, and constraints across all plants are captured.
Optimize multi-plant
Schedules are solved across 60+ facilities together.
Honor constraints
Capacity, materials, and demand limits are respected.
Replan
Schedules adapt as conditions change.
Integrations
Ideal for
- Multi-plant manufacturers
- Production planning and operations teams
- Automotive and industrial producers
- Networks planned largely by hand today
- facilities planned
- 0+facilities planned
FAQ
How many plants can it plan?
It optimizes across 60+ facilities simultaneously.
What constraints does it respect?
Capacity, materials, and demand among others – constraint solving is core to the engine.
What happens when conditions change?
Replanning adapts the schedule rather than forcing a manual rebuild.
Does it replace our MES or ERP?
No – it plans on top of your existing MES and ERP systems.