Harmonizing EBOM to MBOM Discrepancies During Electric Vehicle Ramp

An Electric Vehicle (EV) original equipment manufacturer ramping up a new dual motor SUV platform across two high volume vehicle assembly plants.

Run on Sama · Traceability & Product Data

Two parallel columns of parts being pulled into register

The challenge

    01

    Frequent Engineering BOM (EBOM) updates released by R&D; (such as battery busbar revisions and harness routing updates) were out of sync with plant Manufacturing BOMs (MBOMs).

    02

    Plant manufacturing engineers relied on weekly spreadsheet reconciliations, leading to assembly line part shortages and line stoppage.

    03

    Engineering Change Orders (ECOs) took up to 3 weeks to manually reconcile across plant MBOMs, resulting in $1.8M in obsolete component write offs.

How Sama solves it

    01

    Multi Domain BOM Dashboard Integration

    Sama centralizes CAD derived EBOMs and plant specific MBOMs into a single real time synchronization cockpit.

    02

    Real Time Discrepancy Detection Engine

    Automatically highlights part number mismatches, quantity deltas, and revision discrepancies between engineering and manufacturing.

    03

    Visual Part Dependency Tree Mapping

    Renders interactive part dependency trees showing how changes to battery modules ripple into structural brackets and wiring harnesses.

    04

    Automated ECO Line Item Impact Analysis

    Computes exact line item revision deltas and alerts manufacturing engineers to pending engineering change releases.

    05

    One Click MBOM Alignment Dispatch

    Propagates approved engineering changes directly to plant ERP and MES execution systems without manual data re entry.

The outcome

ECO reconciliation and MBOM update cycle time slashed
0 weeksECO reconciliation and MBOM update cycle time slashed
BOM mismatch related assembly line stoppages reduced
0%BOM mismatch related assembly line stoppages reduced
  • ECO reconciliation and MBOM update cycle time slashed from 3 weeks to under 4 hours.

  • BOM mismatch related assembly line stoppages reduced by 94% during platform launch.

  • Scrap and obsolete component inventory write offs reduced by $1.4M.

Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

Bring us the version of this that you actually have.

Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.