Root-Cause Isolation via Bidirectional Traceability in Industrial Automation

A manufacturer of industrial Variable Frequency Drives (VFDs) and power control modules produces high-voltage power conversion units for water treatment facilities and automated factory floors. Each drive undergoes rigorous end-of-line electrical testing before field installation.

Run on Anvaya · Traceability & Product Data

Threads running both upstream and downstream from a single flagged node

The challenge

    01

    A field failure is reported for an installed VFD (Serial # VFD-9021-X) that suffered a thermal power stage breakdown after 100 hours of operation.

    02

    Quality engineers must quickly determine whether the failure was caused by shop-floor assembly error, incorrect test parameters, or a defective vendor component lot.

    03

    Legacy traceability is strictly unidirectional; finding whether other active WIP jobs contain components from the same suspect batch requires opening hundreds of physical job jackets.

How Anvaya solves it

    01

    Backward Serial Traceability

    Quality engineers input Serial # VFD-9021-X into Anvaya Bidirectional Traceability. The system instantly traces backward from the failed unit to identify the exact power MOSFET lot (Lot # MOSFET-441-A) used during assembly.

    02

    Vendor Defect Correlation

    Cross-referencing component test data confirms Lot # MOSFET-441-A contains a latent silicon gate defect from the semiconductor vendor.

    03

    Forward Traceability to Active WIP

    With a single click, engineers switch from backward to forward tracing starting from Lot # MOSFET-441-A. Anvaya instantly searches all active shop-floor work orders.

    04

    Inline WIP Identification

    Anvaya flags three active production orders currently on the assembly line that contain MOSFETs from the identical defective batch.

    05

    Immediate Floor Containment

    Quality supervisors halt the affected WIP orders directly from the platform, sending inline rework instructions to operator workstations before the drives undergo final potting and box- build.

The outcome

investigation time from field failure report to root-cause
0 daysinvestigation time from field failure report to root-cause
manufacturer submits an indisputable, data-backed warranty
0%manufacturer submits an indisputable, data-backed warranty
  • Investigation time from field failure report to root-cause isolation drops from 5 days to 20 minutes.

  • 48 defective VFD units currently in production are intercepted and reworked before shipping to customer sites.

  • The manufacturer submits an indisputable, data-backed warranty claim to the semiconductor vendor, recovering 100% of material rework costs.

Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

Bring us the version of this that you actually have.

Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.