Geopolitical Trade Tariff & Supply Chain Embargo Mitigation
An international defense and aerospace subsystem manufacturer sourcing precision machined forgings and optical components across multiple global jurisdictions.
Run on Sankalp · Production Planning & Scheduling

The challenge
The unexpected imposition of a 25% import tariff on overseas optical sub assemblies threatened product line profitability.
Trade compliance regulations required restructuring supply chains to meet domestic content rules within 90 days.
Leadership had no easy way to evaluate the cost, capacity, and lead time impacts of qualifying secondary domestic suppliers.
How Sankalp solves it
Tariff & Trade Compliance Matrix Modeling
Sankalp models customs tariff schedules, country of origin rules, and local content thresholds across multi tier supply chains.
Supplier Capacity & Cost Trade Off Simulation
Compares international tariff inclusive landed costs against pre qualified domestic supplier capacity and tooling lead times.
Dynamic Dual Sourcing Allocation
Calculates the optimal split allocation between domestic and international suppliers to satisfy compliance while minimizing total cost.
Master Schedule Lead Time Adjustment
Adjusts production start dates and safety stock parameters to account for domestic supplier qualification lead times.
Executive Geopolitical Strategy Briefing
Generates board ready financial summaries demonstrating compliance posture, landed cost impacts, and supply chain resilience.
The outcome
- domestic supplier transition completed
- 0 daysdomestic supplier transition completed
- reduced total landed supply chain tariff exposure
- $0Mreduced total landed supply chain tariff exposure
Absorbed trade tariff shock with zero disruption to active military and aerospace customer contracts.
Domestic supplier transition completed in 45 days, beating statutory compliance deadlines by 6 weeks.
Reduced total landed supply chain tariff exposure by $2.1M.
Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.
Capabilities used
Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.
More from Sankalp
Finance
Raw Material Price Shock Absorption & Margin Preserving Replanning
A major structural steel and heavy pressure vessel manufacturer consuming 45,000 metric tons of specialized alloy plate and forged fittings annually.
Operations
Global Freight Disruption & Intermodal Logistics Rerouting
A global power equipment manufacturer shipping heavy transformers and turbine housings via international maritime, rail, and heavy haul trucking routes.
Operations
Catastrophic Factory Disruption & Multi Site Work Order Resequencing
A major industrial valve and actuator manufacturer with 5 plants, experiencing a major structural fire at Plant 2 that disabled the main heat treatment and machining bay for 60 days.
Bring us the version of this that you actually have.
Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.