Global Freight Disruption & Intermodal Logistics Rerouting
A global power equipment manufacturer shipping heavy transformers and turbine housings via international maritime, rail, and heavy haul trucking routes.
Run on Sankalp · Production Planning & Scheduling

The challenge
A critical international port strike and canal transit restrictions stranded 40 ocean freight containers of key sub components.
Downstream final assembly lines faced complete shutdown within 72 hours if alternative transport corridors were not established.
Logistics coordinators lacked real time visibility into alternative intermodal freight routes and associated shipping cost trade offs.
How Sankalp solves it
Live Intermodal Logistics Tracking & Alerting
Sankalp integrates maritime AIS vessel tracking and port congestion indices directly with active manufacturing work orders.
Automated Disruption Ripple Modeling
Calculates the exact shop floor assembly impact and part shortage timelines caused by in transit freight delays.
Intermodal Rerouting Optimization
Models alternative air cargo, secondary port, and rail transport routes, balancing expedited freight costs against factory downtime penalties.
Assembly Line Pacing & Resequencing
Resequences factory assembly schedules to prioritize orders with local material availability while expedited components transit.
Carrier Booking Dispatch
Dispatches updated freight booking instructions to global logistics partners to execute chosen rerouting plans.
The outcome
- zero assembly line shutdowns despite
- 0 dayzero assembly line shutdowns despite
- critical customer delivery commitments maintained
- 0%critical customer delivery commitments maintained
Zero assembly line shutdowns despite a 14 day major international port disruption.
92% of critical customer delivery commitments maintained through optimized intermodal rerouting.
Avoided $1.2M in contractual liquidated damages and factory idle labor costs.
Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.
Capabilities used
Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.
More from Sankalp
Finance
Raw Material Price Shock Absorption & Margin Preserving Replanning
A major structural steel and heavy pressure vessel manufacturer consuming 45,000 metric tons of specialized alloy plate and forged fittings annually.
Finance
Geopolitical Trade Tariff & Supply Chain Embargo Mitigation
An international defense and aerospace subsystem manufacturer sourcing precision machined forgings and optical components across multiple global jurisdictions.
Operations
Catastrophic Factory Disruption & Multi Site Work Order Resequencing
A major industrial valve and actuator manufacturer with 5 plants, experiencing a major structural fire at Plant 2 that disabled the main heat treatment and machining bay for 60 days.
Bring us the version of this that you actually have.
Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.