Global Freight Disruption & Intermodal Logistics Rerouting

A global power equipment manufacturer shipping heavy transformers and turbine housings via international maritime, rail, and heavy haul trucking routes.

Run on Sankalp · Production Planning & Scheduling

A blocked corridor handing its load to a different mode

The challenge

    01

    A critical international port strike and canal transit restrictions stranded 40 ocean freight containers of key sub components.

    02

    Downstream final assembly lines faced complete shutdown within 72 hours if alternative transport corridors were not established.

    03

    Logistics coordinators lacked real time visibility into alternative intermodal freight routes and associated shipping cost trade offs.

How Sankalp solves it

    01

    Live Intermodal Logistics Tracking & Alerting

    Sankalp integrates maritime AIS vessel tracking and port congestion indices directly with active manufacturing work orders.

    02

    Automated Disruption Ripple Modeling

    Calculates the exact shop floor assembly impact and part shortage timelines caused by in transit freight delays.

    03

    Intermodal Rerouting Optimization

    Models alternative air cargo, secondary port, and rail transport routes, balancing expedited freight costs against factory downtime penalties.

    04

    Assembly Line Pacing & Resequencing

    Resequences factory assembly schedules to prioritize orders with local material availability while expedited components transit.

    05

    Carrier Booking Dispatch

    Dispatches updated freight booking instructions to global logistics partners to execute chosen rerouting plans.

The outcome

zero assembly line shutdowns despite
0 dayzero assembly line shutdowns despite
critical customer delivery commitments maintained
0%critical customer delivery commitments maintained
  • Zero assembly line shutdowns despite a 14 day major international port disruption.

  • 92% of critical customer delivery commitments maintained through optimized intermodal rerouting.

  • Avoided $1.2M in contractual liquidated damages and factory idle labor costs.

Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

Bring us the version of this that you actually have.

Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.