Global 60+ Plant Capacity Balancing & Workload Re- Allocation

A multinational industrial equipment manufacturer operating 60+ production facilities across 4 continents, producing custom hydraulic pumps, valves, and heavy gearboxes.

Run on Niyojan · Production Planning & Scheduling

Load levelling across a wide grid of plant cells

The challenge

    01

    Primary manufacturing facilities in North America operated at 95% capacity overload while secondary plants in South America sat underutilized at 60% capacity.

    02

    Planners managed facility schedules in isolated spreadsheet silos, making cross-factory workload re-allocation slow and complex.

    03

    Overloaded plants incurred massive unplanned overtime costs while underutilized plants suffered idle labor overhead.

How Niyojan solves it

    01

    Enterprise 60+ Plant Command Cockpit

    Niyojan unifies active order books, machine utilization rates, labor availability, and shipping logistics across all 60+ facilities into one live dashboard.

    02

    Automated Multi-Plant Order Allocation

    Evaluates global machine capabilities, tooling availability, customer delivery windows, and freight costs to calculate optimal order placement.

    03

    Dynamic Capacity Balancing

    Automatically re-allocates standard product runs from overloaded North American plants to open capacity bays in South America.

    04

    Global Constraint Identification

    Flags multi-plant bottlenecks (e.g., global shortages of specific heat- treatment furnace hours) before schedule commitments are released.

    05

    Master Production Schedule Dispatch

    Publishes synchronized master schedules directly to local plant ERP execution systems.

The outcome

overall increase in enterprise fleet capacity utilization
0%overall increase in enterprise fleet capacity utilization
reduction in unplanned overtime costs by balancing workload
0%reduction in unplanned overtime costs by balancing workload
  • 18% overall increase in enterprise fleet capacity utilization across 60+ manufacturing plants.

  • 75% reduction in unplanned overtime costs by balancing workload evenly across global facilities.

  • Accelerated global master planning cycle time from 10 days to 2 hours.

Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

Bring us the version of this that you actually have.

Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.