ManufacturingOperationsRepresentative scenario

Order SLA Protection & Overtime Minimization During Demand Spikes

A commercial HVAC equipment manufacturer producing custom rooftop air handling units with high seasonal demand surges during pre-summer months.

Run on Niyojan · Production Planning & Scheduling

A surge absorbed without the commitment line being crossed

The challenge

    01

    A 45% seasonal surge in customer orders threatened contract delivery SLAs, risking heavy liquidated damage penalties.

    02

    Plant managers authorized uncoordinated weekend overtime across all departments, driving labor costs up by 35% without resolving specific assembly bottlenecks.

    03

    Planners could not determine which specific departments actually required overtime to protect delivery SLAs.

How Niyojan solves it

    01

    Demand Surge Schedule Simulation

    Niyojan models incoming order volumes against finite plant capacity, identifying exact delivery SLA breach risks.

    02

    Targeted Bottleneck Overtime Optimization

    Calculates the exact minimal overtime hours required exclusively at bottleneck work centers (e.g., coil brazing) to preserve 100% of order SLAs.

    03

    Non-Bottleneck Shift Smoothing

    Schedules non-bottleneck departments (e.g., sheet metal fabrication) on standard shifts, eliminating unnecessary overtime spend.

    04

    Dynamic Customer Priority Rules

    Sequences orders by contract penalty severity and customer SLA windows automatically.

    05

    Labor Budget vs SLA Trade-Off Analytics

    Provides plant directors with clear cost-benefit dashboards for alternative overtime proposals.

The outcome

on-time delivery maintained across pre-summer demand spike
0%on-time delivery maintained across pre-summer demand spike
reduction in overtime labor spend by restricting overtime
0%reduction in overtime labor spend by restricting overtime
  • 100% on-time delivery maintained across pre-summer demand spike season with zero SLA penalty fines.

  • 62% reduction in overtime labor spend by restricting overtime exclusively to identified bottleneck workstations.

  • Preserved project gross margins while absorbing a 45% volume surge.

Representative scenario: a modelled industry situation showing how this accelerator applies. Figures are projections, not a named client result.

Capabilities used

Every accelerator is assembled from the same capability layer, so a workflow you adopt here shares its foundation with the rest of the portfolio.

Bring us the version of this that you actually have.

Every engagement is fixed-scope and outcome-guaranteed. The scoping conversation starts with your systems, not with a template.